Wednesday, August 31, 2011

Workshop Setup Complete

Mostly finished setting up a workspace to well.. work on stuff. This should make things easier to build with everything being in one place. I do mostly electronics work, unfortunately you cannot avoid the mechanical side of things when doing such work.

Here are some pictures of the shop:

Books for reference material and on-hand guides, theory, formula etc.

Electronics test bench.

Basic tools and workbench with vice, drill press, hand drill, and dremil tool.

You can never have enough parts or parts drawers.

Another angle of the drill press.

Well that's it for now, will begin work on the coils again shortly with the shop up and running. Feels like it takes forever to get these things done, just get distracted all the time with other projects and work. Next challenge is to install the primary coils on the SSTC and program the micro-controllers.

No comments:

Post a Comment